PUB / 02

PUBLIC SECTOR / GOVERNMENT

Official documents, cards and security papers, delivered as a coordinated programme

From passports and travel permits to official paper, security seals and archival stock, delivered to regulatory requirements. Compliance before appearance: unique serials, verifiable security, retained samples, logged destruction.

20yrs

Security printing experience

100+

Security features available

0

Major quality incidents

WHY YIKO

A public document is not ordinary print.

Unique serials. Verifiable security. Retained samples. Logged destruction. These requirements decide the process order — and who can deliver it.

We design verification before print. First confirm how the document will be checked on site — by eye, UV, touch or scan — then work backwards into material and process. This prevents a common failure: security features nobody can actually verify.

  • Compliance before appearance

    Layout, features and process satisfy regulation and inspection first. Visual design follows.

  • Every batch can be revisited

    Materials, plates, first articles and waste records are bound to the batch. Retention samples remain available.

  • Verification designed in

    The checking route is designed around site conditions, not left to a manual.

Hand checking security paper under light
PUBLIC SECTOR / CONTROLLED DOCUMENT

DELIVERABLES

From a passport booklet to a security seal.

A coherent delivery is not a bundle of products. It is one shared logic for numbering, retention and traceability.

01 PASSPORT

Passports / permits

Data-page security printing, binding and chip integration; retention samples to ICAO requirements.

  • Data page
  • Binding
  • MRZ
02 OFFICIAL PAPER

Official & archival paper

Watermarked paper, security threads and anti-copy guilloche, with optional serials and QR registration.

  • Watermark
  • Anti-copy
  • Serials
03 SECURITY SEAL

Security seals

Ink formulation, microtext on the die and visual / tactile verification after impression.

  • Microtext
  • Security ink
  • Tactile
04 LICENCES

Certificates & licences

Qualification certificates and licence documents with standardised layouts and short-run capacity.

  • Certificates
  • Licences
  • Consistency

VERIFICATION FIRST

Ask who verifies before adding features.

The same document, checked by different people, needs a different combination. Choose the main verification route on site to see which features should come first.

The public or a counter clerk, with no equipment, making a first judgement.

Priority features
  • Watermark & thread
  • OVI colour shift
  • DOVID hologram
  • Microtext
NOTE

Make sure the feature is visible by changing angle. Do not rely solely on a feature that requires training.

PROCUREMENT

Put these questions in the tender.

A clear tender shortens the loop and makes competing quotes comparable.

01

Use & circulation

Who uses it, where, for how long, and whether it crosses borders.

02

Verification route

Eye, UV, touch or scan — and who performs each check.

03

Volume & batches

Total volume, batch ceilings, phased delivery and retention requirements.

04

Serial rules

Allocation, voiding, duplicate handling and any verification API.

05

Regulation & standards

Applicable document specifications, industry standards and acceptance checklist.

06

Inspection & handover

Sampling ratio, non-conformance handling, sealing and handover documents.

FAQ

On compliance, retention and delivery.

These answers reflect common project experience. A live project is governed by its contract and inspection checklist.

01Can we validate with a small batch first?

Yes. The usual route is specification, physical proof, first-article approval, then batch delivery. A pilot run is possible, but platemaking and spot-colour set-up are assessed separately.

02Can you follow our existing acceptance process?

Yes. We ask for the acceptance checklist at specification stage and write sampling ratios, methods and record formats into the delivery requirement.

03How are plates and serial data protected?

Plate data is not sent outside; platemaking happens in a controlled area. Serial ranges are registered by batch, with voiding and duplicate records. At project close, data is returned, sealed or destroyed as agreed.

NEXT

Confirm how it will be verified. Then design the process.

Tell us the use case, verification method and volume. Within 48 hours you will receive an executable material and process checklist.